
TERMINAL PAN AMERICAN ENERGY (PAE)
Terminal / Berth location: Km 96.5 Paraná de las Palmas river, right margin.
Terminal is provided of 4 piers, named from west to east: C / H / G and E, through them crude oil and light products are transfered to vessels and barges.
Bunkers provision: only by shore line.
PIER C
- Max LOA allowed: 230 Mts.
- Max.BEAM allowed: 38 Mts.
- Min Length : 32 mts
- Max draft :9.15 mts
- Fresh water provision: YES (Only by truck)
- Food provisions: YES (Only by barge)
PIER H
- Max LOA allowed: 220 Mts.
- Max.BEAM allowed: 37/30(*) Mts.
- Min Length : 80 mts
- Max draft : 10.37 mts
- Fresh water provision: YES (Only by truck)
- Food provisions: YES (Only by barge)
- (*) For the loading of coke in general cargo vessels, the maximum length is 30 mt
PIER G
- Max LOA allowed: 100 Mts.
- Max.BEAM allowed: 25 Mts.
- Min Length : 30 mts
- Max draft : 5.50 mts
- Fresh water provision: YES (Only by truck)
- Food provisions: YES (Only by barge)
PIER E
- Max LOA allowed: 150 Mts.
- Max.BEAM allowed: 32 Mts.
- Min Length : 60 mts
- Max draft : 7.80 mts
- Fresh water provision: YES (Only by truck)
- Food provisions: YES (Only by barge)
